AI for building permits in BC: what works today

Every resubmission adds weeks to a project. Most of that delay has nothing to do with design quality. It comes from three places: assembling a complete application, checking the set before it goes in, and answering plan-review comments when it comes back.

Those three jobs are repetitive, document-heavy and rule-based, which is exactly where today's AI tools are useful.

Where the time goes

  • Assembly. Every municipality has its own forms, checklists and supporting documents. Keeping track of them across several cities is a job in itself.
  • Checking. Before submission, someone has to review the set against the building code and the local zoning bylaw. On a busy week, that review gets rushed.
  • Responding. Plan-review comments arrive as a letter or a marked-up PDF. Turning them into a response letter and a revision list takes hours.

What AI does well today

  • Completeness checks. Comparing your package against a municipality's checklist and listing what is missing.
  • Pre-submission review. Flagging likely code issues for a designer to confirm. This is what our sister company's product, CodeCheckPro, was built to do.
  • Drafting comment responses. Turning a list of comments into a structured response letter and a drawing revision list.
  • Summarizing bylaws. Pulling the zoning rules for a specific lot into one page, with references to the source.

What it doesn't do

AI does not seal drawings or replace a registered professional or certified designer. It can be wrong about code interpretation, especially local amendments and policies that change often. It needs current versions of codes and bylaws to be useful. Treat every output as a checklist for a qualified person, not as an answer.

A 30-day plan to test it

  1. Week 1: Count resubmission rounds and days to permit on your last ten applications. That is your baseline.
  2. Week 2: Build a completeness checklist for the two or three municipalities you submit to most.
  3. Week 3: Run an AI pre-check on your next two applications before you submit them. Log what it caught and what it got wrong.
  4. Week 4: Compare against your baseline. Keep what saved time and drop what didn't.

If you would rather have help, that is what our 360 Assessment covers, with permits as the most common starting point.

Next step

Start with two weeks and a fixed price.

The 360 Assessment is $4,500 CAD and credited in full to a Pilot Sprint. Our first five clients pay the founding rate of $2,500.